After hauling the fully laden 220,000-ton vessel over the canal bank, the salvage team was pulling the vessel toward the Great Bitter Lake, a wide stretch of water halfway between the north and south end of the canal, where the ship will undergo technical inspection. READ MORE
Monday, 29 March 2021
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment